Abstract
The following are treated: (a) Starting schedules after shutdowns of various durations, (b) reheat economics based on experiences, (c) conversion to centralized control of auxiliaries, (d) reheat steam-temperature control, (e) turbine overspeed control as affected by reheat, and (f) reliability data. That reheat has been desirable in all respects is indicated.
Issue Section:
Research Papers
This content is only available via PDF.
Copyright © 1952 by ASME
You do not currently have access to this content.