During the phases of a U.S. Navy acquisition program for any new system, such as a gas turbine system, various analyses are conducted to evaluate the economic and technical benefits that can be gained by the new system. It is important that the economic analyses provide a good estimation of the nonrecurring and recurring costs. For the development of a new gas turbine system, a test program to prove the system’s technical and operational capability will have to be conducted and a support system will have to be developed to operate and maintain it during its life cycle. The costs of the engine development, the test program, and the support system development are considered nonrecurring or investment costs. The operation and maintenance costs over the life of the system are the recurring costs. This paper presents the life cycle cost scenario that should be used to evaluate the economics of a U.S. Navy marine gas turbine and the considerations that should be included in a Return on Investment analysis of the engine. The major cost categories discussed include engineering, logistics support, program management, and deployment support. Also, the unique considerations that would apply to marine gas turbines for Naval use are discussed along with how these considerations affect the economics of a gas turbine acquisition program. In addition, the paper identifies the funding responsibility of each cost item and provides discussion on ways to reduce the investment cost.
Skip Nav Destination
Article navigation
April 1988
Research Papers
Economic Considerations for a New Gas Turbine System in the U.S. Navy
J. C. Ness,
J. C. Ness
David Taylor Naval Ship Research and Development Center, Annapolis, MD 21402
Search for other works by this author on:
C. B. Franks,
C. B. Franks
Advanced Technology, Inc., Arlington, VA 22202
Search for other works by this author on:
R. L. Sadala
R. L. Sadala
Advanced Technology, Inc., Arlington, VA 22202
Search for other works by this author on:
J. C. Ness
David Taylor Naval Ship Research and Development Center, Annapolis, MD 21402
C. B. Franks
Advanced Technology, Inc., Arlington, VA 22202
R. L. Sadala
Advanced Technology, Inc., Arlington, VA 22202
J. Eng. Gas Turbines Power. Apr 1988, 110(2): 271-278 (8 pages)
Published Online: April 1, 1988
Article history
Received:
February 6, 1987
Online:
October 15, 2009
Citation
Ness, J. C., Franks, C. B., and Sadala, R. L. (April 1, 1988). "Economic Considerations for a New Gas Turbine System in the U.S. Navy." ASME. J. Eng. Gas Turbines Power. April 1988; 110(2): 271–278. https://doi.org/10.1115/1.3240117
Download citation file:
14
Views
Get Email Alerts
Cited By
Multi-Disciplinary Optimization of Gyroid Topologies for a Cold Plate Heat Exchanger Design
J. Eng. Gas Turbines Power
Comparison of Rim Sealing Effectiveness in Different Geometrical Configurations
J. Eng. Gas Turbines Power
Related Articles
Life Cycle Cost Analysis of a Novel Cooling and Power Gas Turbine Engine
J. Energy Resour. Technol (December,2010)
Feasibility Study of an Intercooled-Cycle Marine Gas Turbine
J. Eng. Gas Turbines Power (March,2008)
Royal Navy Experience of Propulsion Gas Turbines and How and Why This Experience is Being Incorporated Into Future Designs
J. Eng. Gas Turbines Power (October,2000)
U. S. Navy’s Marine Gas Turbines
J. Eng. Power (January,1967)
Related Proceedings Papers
Related Chapters
Performance Testing of Combined Cycle Power Plant
Handbook for Cogeneration and Combined Cycle Power Plants, Second Edition
Decision Making in Two-Dimensional Warranty Planning (PSAM-0186)
Proceedings of the Eighth International Conference on Probabilistic Safety Assessment & Management (PSAM)
Empirical Analysis on the Relationship between Regional Logistics and Regional Economy in China
International Conference on Information Technology and Management Engineering (ITME 2011)