The present work deals with the regulation system of a plant recovering the energy of blast-furnace gas coke residual pressure. Such a plant is equipped with a turbogenerator, which produces electric energy, expanding the gas coke up to the mill pipe network pressure value. Before revamping, the regulation system consisted of an automatic nozzle control of a turbine stator and a throttle valve. Once the system became operative, the regulation system seemed to be inadequate because it caused a significant reduction in energy recovery due to the variation of the gas coke characteristics, compared to the original engineering specifications. A mathematical model for the plant simulation has been developed through the regulation system static and dynamic responses. This simulation, together with a series of experimental tests, identified the causes of the operational problems in the original regulation system. On the basis of the response times of the old regulation system, a value with reduced intervention inertia has been suggested. The regulation logic was also modified: The valve interventions were directly linked to the pressure variations recorded at the blast furnace top, and no longer to the opening variation of the turbine automatic system. A more rational use of the plant components and its control system, together with an increase of the electric energy production, have been demonstrated.
Skip Nav Destination
Article navigation
July 1996
Research Papers
Energy Recovery of Blast-Furnace Gas Coke: The Importance of a Correct Regulation System
D. Laforgia,
D. Laforgia
Istituto di Macchine ed Energetica, Polytechnic of Bari, Italy
Search for other works by this author on:
F. Ruggiero
F. Ruggiero
Istituto di Macchine ed Energetica, Polytechnic of Bari, Italy
Search for other works by this author on:
D. Laforgia
Istituto di Macchine ed Energetica, Polytechnic of Bari, Italy
F. Ruggiero
Istituto di Macchine ed Energetica, Polytechnic of Bari, Italy
J. Eng. Gas Turbines Power. Jul 1996, 118(3): 610-619 (10 pages)
Published Online: July 1, 1996
Article history
Received:
July 27, 1994
Online:
November 19, 2007
Citation
Laforgia, D., and Ruggiero, F. (July 1, 1996). "Energy Recovery of Blast-Furnace Gas Coke: The Importance of a Correct Regulation System." ASME. J. Eng. Gas Turbines Power. July 1996; 118(3): 610–619. https://doi.org/10.1115/1.2816692
Download citation file:
Get Email Alerts
Cited By
Experimental Characterization of Superheated Ammonia Spray from a Single-hole ECN Spray M Injector
J. Eng. Gas Turbines Power
Improving the Predictive Capability of Empirical Heat Transfer Correlations for Hydrogen Internal Combustion Engines
J. Eng. Gas Turbines Power (October 2025)
The Hybrid Pathway to Flexible Power Turbines: Part IV, Automated Construction of Mesh Derived Thermal Network Models for Fast Full-Machine Thermal Analysis
J. Eng. Gas Turbines Power (October 2025)
Related Articles
Modeling a Pneumatic Turbine Speed Control System
J. Dyn. Sys., Meas., Control (March,2000)
Development and Application of a Complete Multijet Common-Rail Injection-System Mathematical Model for Hydrodynamic Analysis and Diagnostics
J. Eng. Gas Turbines Power (November,2008)
Computational Study of a High-Expansion Ratio Radial Organic Rankine Cycle Turbine Stator
J. Eng. Gas Turbines Power (May,2010)
Optimization of Performance Characteristics of Electropneumatic (Two-Stage) Servo Valve
J. Dyn. Sys., Meas., Control (June,2004)
Related Proceedings Papers
Related Chapters
A Simple Carburetor
Case Studies in Fluid Mechanics with Sensitivities to Governing Variables
Occlusion Identification and Relief within Branched Structures
Biomedical Applications of Vibration and Acoustics in Therapy, Bioeffect and Modeling
Case Studies
Nonlinear Regression Modeling for Engineering Applications: Modeling, Model Validation, and Enabling Design of Experiments