Abstract

Nuclear safety analysis and licensing criteria are based upon the concept that plant situations that are expected to have a high frequency of occurrence must not pose a danger to the public, and that plant situations that could pose a danger to the public must be limited to situations that have a very low expected frequency of occurrence. This concept is implemented by grouping postulated plant situations (or events) into categories that are defined according to their expected frequencies of occurrence (i.e., high-frequency, low-consequence events, and low-frequency, high consequence events). In plant licensing basis analyses, events in each category must be shown to yield consequences that remain within the limits that are specified for that category. To protect the integrity of this categorization scheme, events must not be allowed to develop into the more serious events that belong in other, higher-consequence categories. In other words, nuclear plant designs must not allow high-frequency, low-consequence events to degrade into high-frequency, high-consequence events. The development of this system of frequency-based categorization is discussed, followed by an evaluation of various methods that could, and could not be used to demonstrate, for licensing purposes, that benign events are prevented from becoming serious accidents.

References

1.
ANS
,
1973
, “Nuclear Safety Criteria for the Design of Stationary Pressurized Water Reactor Plants,”
American Nuclear Society
,
La Grange Park, IL
, Aug. 6, Report No.
ANS-N18.2-1973
.https://inis.iaea.org/search/search.aspx?orig_q=RN:15073016
2.
ANS
,
1974
, “Nuclear Safety Criteria for the Design of Stationary Boiling Water Reactor Plants,”
American Nuclear Society
,
La Grange Park, IL
, Report No.
ANS-N212
.https://inis.iaea.org/search/search.aspx?orig_q=RN:5149024
3.
U.S. AEC,
1967
, “General Design Criteria for Nuclear Power Plant Construction Permits,” U.S. Atomic Energy Commission, Bethesda, MD, July 11, Report No. 32 FR 10213.
4.
U.S. AEC,
1971
, “10 CFR Sec. 50, Appendix A,” U.S. Atomic Energy Commission, Bethesda, MD, Report No. 36 FR 12733.
5.
U.S. AEC,
1972
, “Regulatory Guide 1.70, Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants,” Rev. 0, U.S. Atomic Energy Commission, Bethesda, MD, ADAMS No. ML11255A151.
6.
U.S. NRC,
1996
, “Standard Review Plan: For the Review of Safety Analysis Reports for Nuclear Power Plants,” Draft Rev 3, U.S. Nuclear Regulatory Commission, Rockville, MD, Technical Report No.
NUREG-0800
(formerly NUREG-75/087).https://www.nrc.gov/docs/ML0523/ML052340534.pdf
7.
U.S. NRC,
2003
, “Review Standard for Extended Power Uprates,” Rev. 0, U.S. Nuclear Regulatory Commission, Rockville, MD, Report No. RS
001
(see Note 8 of Matrix 8 in Sec. 2.1).https://www.nrc.gov/reactors/operating/licensing/power-uprates/rs-001-rev-0-dec2003.pdf
8.
U.S. NRC,
2005
, “Anticipated Transients that Could Develop into More Serious Events,” NRC Regulatory Issue Summary (RIS) 2005-29, U.S. Nuclear Regulatory Commission, Rockville, MD, Dec. 14, ADAMS No.
ML051890212
;https://www.gpo.gov/fdsys/search/pagedetails.action?granuleId=2015-17510&packageId=FR-2015-07-17&acCode=FR&collectionCode=FR
U.S. NRC, 2015, “Anticipated Transients that Could Develop into More Serious Events,” NRC RIS 2005-29, Rev. 1, U.S. Nuclear Regulatory Commission, Rockville, MD, July 17, ADAMS No.
ML15014A469
.https://www.nrc.gov/docs/ML1501/ML15014A469.pdf
9.
U.S. NRC,
1978
, “Regulatory Guide 1.70, Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants,” Rev. 3, U.S. Nuclear Regulatory Commission, Rockville, MD, ADAMS No.
ML011340116.
https://www.nrc.gov/docs/ML0113/ML011340072.pdf
10.
U.S. NRC,
1979
, “Transmittal of Reports Regarding Foreign Reactor Operating Experiences (Generic Letter 79-45),” U.S. Nuclear Regulatory Commission, Rockville, MD, Sept. 25, ADAMS No.
ML031320181
.https://www.nrc.gov/reading-rm/doc-collections/gen-comm/gen-letters/1979/gl79045.html
11.
U.S. NRC,
1979
, “Review of Operational Errors and System Misalignments Identified During the Three Mile Island Incident,” U.S. Nuclear Regulatory Commission, Rockville, MD, Apr. 14, Bulletin No.
79-06A
. https://www.nrc.gov/reading-rm/doc-collections/gen-comm/bulletins/1979/bl79006b.html
12.
Kemeny
,
J. G.
,
1979
, “Report of the President's Commission on the Accident at Three Mile Island,” President's Commission on the Accident at Three Mile Island, Washington, DC, Oct. 30, pp. 29–30 (for mention of the Davis Besse incident).
13.
U.S. NRC,
1994
, “Information Notice 94-55: Problems with Copes-Vulcan Pressurizer Power-Operated Relief Valves,” U.S. Nuclear Regulatory Commission, Rockville, MD, Aug. 4, ADAMS No.
ML031060536
.https://www.nrc.gov/reading-rm/doc-collections/gen-comm/info-notices/1994/in94055.html
14.
U.S. NRC,
1994
, “Press Release No. 94-157, NRC Staff Proposes to Fine PSE&G $500,000 for Alleged Violations at Salem Nuclear Power Plant,” U.S. Nuclear Regulatory Commission, Rockville, MD, Oct. 5, ADAMS No.
ML003702822
.https://www.nrc.gov/docs/ML0037/ML003702822.pdf
15.
U.S. NRC,
1997
, “Amendment Nos. 194 and 177, Salem Nuclear Generating Station, Unit Nos. 1 and 2,” U.S. Nuclear Regulatory Commission, Rockville, MD, June 4, ADAMS No. ML011720397.
16.
U.S. NRC,
2005
, “Millstone Power Station Unit 3—NRC Special Inspection Report 05000423/2005012,” U.S. Nuclear Regulatory Commission, Rockville, MD, July 5, ADAMS No.
ML051860338
.https://www.nrc.gov/docs/ML0518/ML051860338.pdf
17.
U.S. NRC,
1998
, “Issuance of Amendment—Millstone Nuclear Power Station, Unit No. 3,” U.S. Nuclear Regulatory Commission, Rockville, MD, June 5, ADAMS No. ML011800207.
18.
ANS
,
1994
, “Time Response Design Criteria for Safety Related Operator Actions,”
American Nuclear Society
,
La Grange Park, IL
, Report No.
ANSI/ANS-58.8-1994
.http://www.ans.org/store/item-240202/
19.
U.S. NRC, 2004, “Issuance of Amendment Re: Credit for Automatic Actuation of Pressurizer Power Operated Relief Valves,” Diablo Canyon Power Plant, Unit Nos. 1 and 2, U.S. Nuclear Regulatory Commission, Rockville, MD, ADAMS No. ML041950260.
20.
Ament, G. G., and Vavrek, K. J., eds.,
1993
, “Inadvertent Operation of ECCS at Power,” Westinghouse Energy Systems Business Unit, Pittsburgh, PA, June 30, Document No. NSAL-93-013; Galembush, J. S., ed., 1994, “Inadvertent Operation of ECCS at Power,” Westinghouse Energy Systems Business Unit, Pittsburgh, PA, Oct. 28, Document No. NSAL-93-013, Suppl. 1, ADAMS No. ML052930330.
21.
Exelon Generation Co., LLC, 2014, “Inadvertent Operation of Emergency Core Cooling System During Power Operation,” Final Safety Analysis Report, Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Downers Grove, IL, Chap. 15.5.1, ADAMS No. ML14363A495.
22.
Pacific Gas & Electric,
1998
, “Reactor Coolant System Outside Design Basis for Inadvertent Emergency Core Cooling System Actuation at Power Due to Non-Conservative Assumptions for Pressurizer Safety Valve Operation,” Diablo Canyon Units 1 and 2, Pacific Gas & Electric, San Francisco, CA, Oct. 22, Licensee Event Report No.
98-001-01
.https://www.nrc.gov/docs/ML1634/ML16342E004.pdf
23.
Crane
,
J. T.
, and
Macdonald
,
A. J.
,
2007
, “Loss-of-Normal Feedwater/Loss-of-Offsite AC Power Analysis PORV Modeling Assumptions,”
Westinghouse
,
Monroeville, PA
, Nov. 7, Document No. NSAL-07-10.
24.
Union Electric Co., 2015, “Inadvertent Operation of Emergency Core Cooling System During Power Operation,” Final Safety Analysis Report, Callaway Station, St. Louis, MO, Chap. 15.5.1, ADAMS No. ML17065A090.
25.
U.S. NRC,
1989
, “Information Notice No. 89-90: Pressurizer Safety Valve Lift Setpoint Shift,” U.S. Nuclear Regulatory Commission, Rockville, MD, Dec. 28, ADAMS No.
ML031190006
.https://www.nrc.gov/reading-rm/doc-collections/gen-comm/info-notices/1989/in89090.html
26.
U.S. NRC,
2015
, “Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2—Backfit Imposition Regarding Compliance with 10 CFR 50.34(B), GDC 15, GDC 21, GDC 29, and Licensing Basis,” U.S. Nuclear Regulatory Commission, Rockville, MD, Oct. 9, ADAMS No.
ML14225A871
.https://www.nrc.gov/docs/ML1422/ML14225A871.pdf
27.
Exelon Generation Company, LLC,
2016
, “Appeal of Imposition of Backfit Regarding Compliance With 10 CFR Sec. 50.34(b), GDC 15, GDC 21, GDC 29, and Licensing Basis,” Exelon Generation Company, Downers Grove, IL, June 2, Letter No. RS-16-134, ADAMS No.
ML16154A254
.https://www.nrc.gov/docs/ML1534/ML15342A112.pdf
28.
U.S. NRC,
2016
, “Result of Appeal to the Executive Director for Operations of Backfit Imposed on Byron and Braidwood Stations Regarding Compliance with 10 CFR 50.34(b), GDC 15, GDC 21, GDC 29, and the Licensing Basis,” U.S. Nuclear Regulatory Commission, Rockville, MD, Sept. 15, ADAMS No.
ML16246A247
.https://www.nrc.gov/docs/ML1624/ML16246A247.pdf
29.
U.S. NRC,
2016
, “U.S. Nuclear Regulatory Commission Response to Backfit Appeal—Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2,” U.S. Nuclear Regulatory Commission, Rockville, MD, May 3, ADAMS No.
ML16095A204
.https://www.nrc.gov/docs/ML1609/ML16095A204.pdf
30.
Miranda, S.,
2016
, “Enforcement Petition (10 CFR §2.206) Regarding Exelon's Byron and Braidwood Stations,” U.S. Nuclear Regulatory Commission, Rockville, MD, Nov. 15, ADAMS No.
ML17010A051
.https://www.nrc.gov/docs/ML1701/ML17010A051.pdf
31.
U.S. NRC,
2017
, “Closure Letter for Enforcement Petition Regarding Exelon's Byron and Braidwood Stations,” Office of the EDO (OEDO)-16-00783, Rockville, MD, June 23, ADAMS No.
ML17108A808
.https://www.nrc.gov/docs/ML1710/ML17108A808.pdf
32.
U.S. NRC, 2017, “Audit of NRC's 10 CFR 2.206 Petition Review Process,” Office of the Inspector General (OIG)-17-23, Rockville, MD, Aug. 22, ADAMS No.
ML17234A561
.https://www.nrc.gov/docs/ML1723/ML17234A561.pdf
You do not currently have access to this content.