The American Petroleum Institute guideline provides a methodology for calculating the risks of equipments installed in refineries or petrochemical plants. However, especially in connection with consequence analysis, there are limitations of its direct application to petrochemical plant. As a principal cause, only representative material is recommended for the risk evaluation while the equipment contains numerous materials. The objectives of this paper are to propose an enhanced risk-based inspection (RBI) method to resolve above shortcomings and to assess the risks of typical petrochemical equipments. In this respect, a RBI program including a material management database is developed to fully incorporate the characteristics of different materials. The proposed program consists of qualitative, semi-quantitative, and quantitative evaluation modules in which representative material, as well as toxic materials, is selected automatically for comparison to those getting from the current guideline. It has been applied to assess the risks of major equipments in ethylene facility such as vessel and column. Thereby, realistic evaluation results were obtained and applicability of the proposed RBI program was proven.

1.
Lim
,
D. S.
, and
Shin
,
P. S.
, 2003, “
Case Study and Necessity of Risk-Based Inspection
,” Report of Safety Health, Korea Industrial Safety Corporation, Incheon.
2.
Shim
,
S. H.
,
Song
,
J. S.
,
Kim
,
J. Y.
, and
Yoon
,
K. B.
, 2003, “
A Study on the Application of RBI Procedure for Petrochemical Plant
,”
KSME Int. J.
1226-4865,
27
(
3
), pp.
416
423
.
3.
Horikawa
,
H.
,
Yoshikawa
,
M.
, and
Takasu
,
N.
, 2004, “
Structural Integrity Assessment for Various Failure Modes Using a Risk-Based Maintenance Method
,”
ASME J. Pressure Vessel Technol.
0094-9930,
490
, pp.
261
270
.
4.
Bareib
,
J.
,
Buck
,
P.
,
Matschecko
,
B.
,
Jovanovic
,
A.
,
Balos
,
D.
, and
Perunicic
,
M.
, 2004, “
RIMAP Demonstration Project. Risk-Based Life Management of Piping System in Power Plant Heilbronn
,”
Int. J. Pressure Vessels Piping
0308-0161,
81
, pp.
807
813
.
5.
Fujiyama
,
K.
,
Nagai
,
S.
,
Akikuni
,
Y.
,
Fujiwara
,
T.
,
Furuya
,
K.
,
Matsumoto
,
S.
,
Takagi
,
K.
, and
Kawabata
,
T.
, 2004, “
Risk-Based Inspection and Maintenance Systems for Steam Turbines
,”
Int. J. Pressure Vessels Piping
0308-0161,
81
, pp.
825
835
.
6.
Jovanovic
,
A.
, 2003, “
Risk-Based Inspection and Maintenance in Power and Process Plants in Europe
,”
Nucl. Eng. Des.
0029-5493,
226
, pp.
165
182
.
7.
Nilsson
,
F.
, 2003, “
Risk-Based Approach to Plant Life Management
,”
Nucl. Eng. Des.
0029-5493,
221
, pp.
293
300
.
8.
Schroder
,
H. C.
, and
Kauer
,
R.
, 2004, “
Regulatory Requirements Related to Risk-Based Inspection and Maintenance
,”
Int. J. Pressure Vessels Piping
0308-0161,
81
, pp.
847
854
.
9.
American Petroleum Institute
, 2000, “
Risk-Based Inspection
,” API Recommended Practice 580.
10.
American Petroleum Institute
, 2000, “
Risk Based Inspection—Base Resource Document
,” API 581.
11.
American Society of Mechanical Engineers
, 1998, “
Boiler and Pressure Vessel Code
,” Sections VIII and IX,
ASME
,
New York
.
12.
American Society of Mechanical Engineers
, 2003, “
Risk-Based Methods for Equipment Life Management: An Application Handbook
,” CRTD, Vol.
41
,
ASME
,
New York
.
13.
Kauer
,
R.
, and
Jovanovic
,
A.
, 2004, “
Plant Asset Management RIMAP, the European Approach
,”
ASME J. Pressure Vessel Technol.
0094-9930,
488
, pp.
183
192
.
14.
Kihara
,
S.
,
Sakai
,
J.
,
Sakai
,
S.
, and
Asakura
,
K.
, 2005, “
Development of Risk Assessment Tools for RBM (Risk Based Maintenance)
,”
Proceedings of JSCE Materials and Environments
, pp.
45
48
.
15.
Det Norske Veritas
, 2000, “
RBI of Offshore Topsides Pressurized Equipment
,” Recommended Practice RP-G 101, Houik.
16.
The Welding Institute
, 2005, “
RISKWISE and LIFEWISE Demo Programs
,” http://www.twisoftware.comhttp://www.twisoftware.com.
17.
Tischuk International
, 2005, “
Tischuk-Operational Criticality Assessment (T-OCA) Demo Program
,” http://www.tishuk.comhttp://www.tishuk.com.
18.
RIMAP
, 2003, “
I3.2-Assessment of the Consequence of Failure
,” http://www.mpa-lifetech.de/RIMAPhttp://www.mpa-lifetech.de/RIMAP.
19.
RIMAP
, 2003, “
I3.3-Assessment of the Probability/Likelihood of Failure
,” http://www.mpa-lifetech.de/RIMAPhttp://www.mpa-lifetech.de/RIMAP.
20.
Cho
,
S. K.
, 2000, “
Petrochemical Plant Process
,” Intervision.
21.
Yaws
,
C. L.
, 1999,
Chemical Properties Handbook
,
McGraw-Hill
,
New York
.
You do not currently have access to this content.