Abstract

With the number of long-distance pipelines increasing in China, risk management has become important for controlling pipeline leakage. However, all the current assessment technologies are semiquantitative and do not include inspection data. To address this problem, a new quantitative risk assessment model is proposed to guide decision-making on excavation inspection and maintenance. Based on previous failure cases, the model includes data about the surrounding soils as well as about the pipeline's protective layer, cathodic protection (CP), and pipe wall thickness readings. Testing of the proposed model on previous failure cases shows that the new model can correctly assess the real leakage risk of a long-distance pipeline and support the quantitative integrity management of a long-distance pipeline during its whole service life.

References

1.
Ishwaran
,
M.
,
King
,
W.
,
Haigh
,
M.
,
Lee
,
T.
, and
Nie
,
S.
,
2017
, “
Analysis of China's Natural Gas Infrastructure Development Strategy
,”
China's Gas Development Strategies
(Advances in Oil and Gas Exploration & Production), Shell Centre, The Development Research Center (DRC) of the State Council of the People's Republic of China, eds.,
Springer
,
Cham, Switzerland
.
2.
Wang
,
J.
,
Jiang
,
H.
,
Zhou
,
Q.
,
Wu
,
J.
, and
Qin
,
S.
,
2016
, “
China's Natural Gas Production and Consumption Analysis Based on the Multicycle Hubbert Model and Rolling Grey Model
,”
Renewable Sustainable Energy Rev.
,
53
, pp.
1149
1167
.10.1016/j.rser.2015.09.067
3.
Hou
,
Y.
,
Lei
,
D.
,
Li
,
S.
,
Yang
,
W.
, and
Li
,
C. Q.
,
2016
, “
Experimental Investigation on Corrosion Effect on Mechanical Properties of Buried Metal Pipes
,”
Int. J. Corros.
,
2016
, p.
5808372
.10.1155/2016/5808372
4.
Karami
,
M.
,
2012
, “
Review of Corrosion Role in Gas Pipeline and Some Methods for Preventing It
,”
ASME J. Pressure Vessel Technol.
,
134
(
5
), p.
054501
.10.1115/1.4006124
5.
Li
,
H. L.
,
Zhao
,
X. W.
, and
Ji
,
L. K.
,
2005
, “
Oil and Gas Pipeline Failure Analysis and Integrity Management
,”
Test. - Phys. Vol.
, 24(1), pp.
24
31
.
6.
Singh
,
R.
,
2014
,
Pipeline Integrity Handbook: Risk Management and Evaluation
, Vol.
51
,
Gulf Professional Publishing
, London,
UK
.
7.
Azevedo
,
C. R. F.
,
2007
, “
Failure Analysis of a Crude Oil Pipeline
,”
Eng. Failure Anal.
,
14
(
6
), pp.
978
994
.10.1016/j.engfailanal.2006.12.001
8.
Shin
,
S.
,
Lee
,
G.
,
Ahmed
,
U.
,
Lee
,
Y.
,
Na
,
J.
, and
Han
,
C.
,
2018
, “
Risk-Based Underground Pipeline Safety Management Considering Corrosion Effect
,”
J. Hazard. Mater.
,
342
, pp.
279
289
.10.1016/j.jhazmat.2017.08.029
9.
Dai
,
L.
,
Wang
,
D.
,
Wang
,
T.
,
Feng
,
Q.
, and
Yang
,
X.
,
2017
, “
Analysis and Comparison of Long-Distance Pipeline Failures
,”
J. Pet. Eng.
,
2017
, p.
3174636
.10.1155/2017/3174636
10.
Siler-Evans
,
K.
,
Hanson
,
A.
,
Sunday
,
C.
,
Leonard
,
N.
, and
Tumminello
,
M.
,
2014
, “
Analysis of Pipeline Accidents in the United States From 1968 to 2009
,”
Int. J. Crit. Infrastruct. Prot.
,
7
(
4
), pp.
257
269
.10.1016/j.ijcip.2014.09.002
11.
Zhou
,
J.
,
Wu
,
X.
, and
Guo
,
Z.
,
2014
, “
Enlightenment From Incidents of Oil and Gas Pipeline in USA
,”
J. Saf. Sci. Technol.
,
10
(
S1
), pp.
73
78
.http://en.cnki.com.cn/Article_en/CJFDTotal-LDBK2014S1016.htm
12.
Leeds
,
J. M.
, and
Waterton
,
M.
,
1999
, “
Correlating Coating Metal Loss Data Can Save O&M Money
,”
Pipeline Gas Ind.
, 82(3), pp.
27
35
.https://www.researchgate.net/publication/289150049_Correlating_coating_and_metal-loss_data_can_save_OM_money/related
13.
Leeds
,
J. M.
, and
Grapiglia
,
J.
,
1995
, “
The DC Voltage-Gradient Method for Accurate Delineation of Coating Defects on Buried Pipe
,”
Corros. Prev. Control
, 42(4), pp.
77
86
.https://www.osti.gov/etdeweb/biblio/122216
14.
Mulvany
,
J.
,
1989
, “
New Pipeline Coating Defect Surveying Equipment for Corrosion Protection Assessment
,”
Mater. Perform.
, 28(4), p.
1721
.https://www.researchgate.net/publication/254980853_New_pipeline_coating_defect_surveying_equipment_for_corrosion_protection_assessment
15.
Muhlbauer
,
W. K.
,
1996
,
Pipe Risk Management Manual
, 2nd ed.,
Gulf Publishing Company
,
Houston, TX
.
16.
API,
2016
, “Pipe Risk-Based Inspection Technology,” API Publishing Service, Washington, DC, Standard No.
581
.https://inspectioneering.com/tag/api+rp+581
17.
NACE,
2010
, “Pipeline External Corrosion Direct Assessment Methodology,” NACE, Washington, DC, Standard No.
RP-0502
.https://law.resource.org/pub/us/cfr/ibr/004/nace.rp0502.2002.pdf
18.
Cong
,
G.
,
Lu
,
D.
,
Lv
,
Y.
, and
He
,
Y.
,
2019
, “
A Novel Industrial Safety IoTs Architecture for External Corrosion Perception Based on Infrared
,”
Mobile Networks Appl.
,
24
(
4
), pp.
1336
1345
.10.1007/s11036-018-1170-4
19.
Standardization Administration of China (SAC),
2011
, “Risk Assessment for Buried Steel Pipeline,” Standardization Administration of China (SAC), Beijing, China, Standard No. GB/T 27512–2011.
20.
Roy
,
D.
,
Simon
,
G. P.
,
Forsyth
,
M.
, and
Mardel
,
J.
,
2002
, “
Towards a Better Understanding of the Cathodic Disbondment Performance of Polyethylene Coatings on Steel
,”
Adv. Polym. Technol.
,
21
(
1
), pp.
44
58
.10.1002/adv.10010
21.
Harun
,
M. K.
,
Marsh
,
J.
, and
Lyon
,
S. B.
,
2005
, “
The Effect of Surface Modification on the Cathodic Disbondment Rate of Epoxy and Alkyd Coating
,”
Prog. Org. Coat.
,
54
(
4
), pp.
317
321
.10.1016/j.porgcoat.2005.07.007
22.
Luo
,
J. L.
,
Lin
,
C. J.
,
Yang
,
Q.
, and
Guan
,
S. W.
,
1997
, “
Cathodic Disbanding of a Thick Polyurethane Coating From Steel in Sodium Chloride Solution
,”
Prog. Org. Coat.
,
31
(
4
), pp.
289
295
.10.1016/S0300-9440(97)00086-6
23.
Standardization Administration of China (SAC),
2014
, “Inspection of Corrosion Protection Engineering for Buried Steel Pipeline,” Standardization Administration of China (SAC), GB/T 27512-2011, Standard No. GB/T19285-2014.
24.
Standardization Administration of China (SAC),
2015
, “Code for Design of Gas Transmission Engineering,” Standardization Administration of China (SAC), GB/T 27512-2011, Standard No. GB50251-2015.
You do not currently have access to this content.